ELECTRICAL EQUIPMENT COMPANY: RACKING PROJECT          [view .PDF]

CHALLENGE

EECO wanted to consolidate branch locations into a centralized regional distribution center to avoid the expense of building new facilities or leasing additional warehouse space.

SOLUTION

PeakLogix reconfiguration of the current Richmond warehouse will allow EECO to recoup ≈ 42% storage capacity and roll additional business volumes for Franklin, Fredericksburg, Norfolk, South Hill and Winchester branches into the existing facility.

RESULTS

• Increased cubic volume capacities.

• Reduced non-value added activities i.e. worker walk, search, reach time.

• Increased staging lanes.

SPECS

Increased storage capacity 42% by:

  • Realigning small parts shelving utilizing modular cabinets located at row ends.
  • Redesigning bulk and hand-pick shelving areas.
  • Adding selective pallet rack for pallet storage and cantilever racking for storage of indoor materials.
  • Relocating cable cutting area.
  • Creating a staging area along dock door wall.