CHALLENGE
EECO wanted to consolidate branch locations into a centralized regional distribution center to avoid the expense of building new facilities or leasing additional warehouse space.
SOLUTION
PeakLogix reconfiguration of the current Richmond warehouse will allow EECO to recoup ≈ 42% storage capacity and roll additional business volumes for Franklin, Fredericksburg, Norfolk, South Hill and Winchester branches into the existing facility.
RESULTS
• Increased cubic volume capacities.
• Reduced non-value added activities i.e. worker walk, search, reach time.
• Increased staging lanes.
SPECS
Increased storage capacity 42% by: