MEADWESTVACO: MODULAR OFFICE [view .PDF]
CHALLENGE
Creation of floor space for process equipment necessitated a second level office system to relocate existing offices and create additional office space within an extremely short time frame (five to six weeks).
SOLUTION
Immediate action plan to determine specific layout and project execution in order to meet tight time constraints and have a successful result with minimal disruption of current operations.
RESULTS
Offices were designed, delivered and installed several weeks prior to the arrival of the key piece of process equipment.
SPECS
•26’ x 48’ two-story modular office.
•First level open for process equipment.
•Second level a combination of two private offices and a multi-person office area.