Client:
Services:
PROJECT MANAGEMENT + IMPLEMENTATION
Project:
CUSTOM SPACE RECONFIGURATION
MeadWestvaco needed to create additional floor space to process equipment within a short time frame (five to six weeks) in preparation for installation of new warehouse equipment.
SOLUTION:
PeakLogix created an action plan to determine specific layout and project execution. The blueprint included a second level office system to relocate existing offices and create additional office space.
RESULTS:
Offices were designed, delivered and installed several weeks prior to the arrival of the key piece of process equipment.
SPECS:
- 26’ x 48’ two-story modular office.
- First level open for process equipment.
- Second level combined two private offices with a multi-person office area.